No Results Found
The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.
The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.
Another tired, undersized lead-acid battery overhaul. This client struggled to run a washing machine during the middle of a bright sunny day without their diesel generator running. The system was removed and replaced with an appropriately designed and installed power system. Energy assurance for another happy off-grider.
This remote resort in The Kimberley with access via light aircraft or barge, was a real adventure! The logistics involved 20 tonnes of infrastructure to be transported by roadtrain and beach landing 2 barges. We were faced with an out of control bushfire which bore...
A power system upgrade was due for this Pineapple farm in South East QLD. After a safe disconnection and removal of the bulging, low charge lead-acid batteries it was time to install the high powered lithiums and upgraded inverter capacity.
This large powdercoating business had energy bills in excess of $3,500/month. With projected figures to buy-back this system in less than 2.5 years, it was a simple decision for our client to install solar at the facility. The savvy client has seen the benefits of the...
One of the first adopters of solar in their suburb, this client has seen extremely good returns on their solar investment, often crediting their bill to the tune of $300-$400. Once their excellent feed-in tariff expired, they were hit with a nasty bill which prompted...
With ever-increasing electricity bills, the energy retailers ruthlessly cast a shadow over house-hold budgets. Our client needed to reclaim control of their power and our solution offered that peace of mind.